"Can you pull one more number into that report? Should take two seconds."
It's a quick side DM to your lead analyst. Then someone catches the same person after standup about a permissions issue. Then there's an email asking for one more filter on the dashboard. (And then the meeting that ends with "can you just take just take a quick look? When’s the soonest you think you could do that?")
None of it formally becomes a task, so later that week, your work management system shows the team finished three things. But the team insists they’re underwater. Then Monday comes around, and leadership is furious because there’s no significant progress on initiatives. And there’s new priorities emerging.
Before you start questioning your team, read this whole article.
The problem we're going to solve together is:
Work is reaching your team through channels nobody tracks
Your work management system says the team has room, and your team says they don't
You can't prioritize (or defend) work you can't see
What are ad hoc work requests?
Ad hoc work requests are any asks that reach your team outside your official intake process. Think chat messages, emails, water cooler conversations, and the "while I have you" moment at the end of a meeting. They're usually small, but they're always urgent to the person asking, and they almost never get formally tracked.
They hit internal teams the hardest. Technology, IT, data and reporting, marketing operations. These teams serve the entire company, which means everyone in the company is basically a client. And every one of those clients has access to your team through a simple chat.
Why do ad hoc requests make your team look slow?
Because the work is real, but there’s no proof it happened. Your work management system only shows what came through the front door, or your formalized intake process. Everything that came through the side door (chat, water cooler convos, meetings, emails) still took hours. It just didn't leave a trace.
So the work management dashboard says the team has capacity, but your team is at capacity, at the same time. Leadership is looking at one of those, and it’s not what’s being said verbally. They’re looking at the data. Which isn’t reality. This leads to friction between leadership and individual contributors. Leadership starts to think the team is exaggerating, and the team starts to think leadership has no clue what's on their plate. (Both are kinda right.)
We dug into the "I'm slammed" side of this in Everyone Says They're at Capacity. Are They?
Why does work end up coming through the side door?
Nobody builds a side door on purpose. It’s a product of rapid growth without governance:
The tool was set up when the team was half the size. Boards got added, columns got added, and there was no need for “standards”, because everyone was on the same page. At some point, sending a DM became easier than figuring out where a request is supposed to go.
Asking directly feels faster. For the person asking, it is. And usually, everyone wants to help, so the open door policy is encouraged.
Your team wants to be helpful. Telling a VP "can you put that in the form?" feels awkward, so they just do it.
Every one of those is a reasonable choice in the moment. Stack them up for a year and you've got a team whose real workload is invisible. Even to the people managing it.
How much do ad hoc requests cost?
If you're not a numbers person, here's what this looks like in dollars. Let’s use a hypothetical:
6-person internal team
Each person gets 6 side-door requests a week
Each one takes about 30 minutes, once you count stopping what you were doing and getting back into it
That's 18 hours a week. Almost half of a full-time person.
At a $65/hr blended rate, that's $1,170 a week in work leadership can't see, didn't prioritize, and isn't counting
Over a quarter, $15,210. Over a year, $60,840.
And that's just the hours. It doesn't count the roadmap work that got bumped to make room.
It's also why buying a new tool rarely fixes this. If work can still come in any way it wants, the new tool ends up looking exactly like the old one. (More on that in Before You Switch Project Management Tools, Try These 5 Things.)
What does fixing this look like in real life?
We saw this exact problem at a food and beverage company we worked with recently. Their technology department covers three teams: product technology, IT support, and data reporting.
They had a work management tool. That wasn't the problem. The challenge was in how it was being used.
Over time, it had turned into a pile of boards and columns with no standard process, no naming conventions, and nobody governing it. Requests came in through side chats and random chat messages. Leadership had zero visibility into capacity or project health.
Here's what we did:
Talked to everyone first. We interviewed people across Technology, IT, and Reporting to map how work was actually moving (not how it was supposed to move).
Confirmed the tool. Discovery validated Monday.com as the right platform for their size and integration needs. (and we actually do our best to not recommend a new tool. We only do it if the current tool limits them to a point they cannot achieve their goals).
Migrated with intention. We moved their existing data over, but restructured it so the new workspace didn't just copy old habits.
Gave every team one front door. Each team got an intake form. Every piece of work now comes in through one documented channel.
Set the standards. Board structures, column standards, and workflow stages, all aligned to agile principles.
Protected their capacity. Automations cut the manual work, and Monday.com's AI flags workload risk and bottlenecks.
Gave leadership an actual view. Dashboards that show resource allocation, project progress, and team capacity in real time.
Connected IT. We integrated Monday.com with their customer service ticketing platform and their internal messaging platform.
What changed:
The side chats are gone. All intake flows through forms, so untracked work requests were eliminated.
Leadership can see resource allocation, progress, and capacity in real time. That data didn't exist before.
Nothing enters the Reporting team's queue without documentation and prioritization.
Overallocation gets flagged before it turns into burnout nobody saw coming.
You can read the full Monday.com case study here.
Does an intake form fix the problem on its own?
No. And this is the part most teams skip.
A form is just a form. The side door closes when people stop walking through it, and that starts with leadership. You can buy any software in the world, but if the behavior isn't dialed in, it won't matter.
If leaders keep sending requests by DM, the team will keep accepting requests by DM. If leaders redirect, the team gets permission to redirect too. It doesn't have to be awkward. Something like:
"Happy to help. Can you drop that in the form so it doesn't get lost?"
Same answer. Every time. Including when it's your boss asking.
How do you set up a work intake process?
Start small. You don't need a new tool or a 40-field form. You need one way in, and everyone using it.
Count the side door for one week. Ask each person to keep a tally of requests that showed up outside the system. No time tracking. Just tally marks.
Pick one front door per team. One form or one channel, inside the tool your team already uses. Keep it short. Four or five fields, max.
Leaders go first. Redirect every side-door request that comes to you, and stop sending them yourself.
What does "good" look like?
Good is when someone asks "what is your team working on, and what's waiting?" and you can answer in under a minute. Without calling a meeting. Without pinging anyone.
In the meantime: think back to the last time someone on your team said they were slammed. How many of the things on their plate were actually on the board? Whatever the gap is, that's your side door.
Frequently asked questions
What is a work intake process?
A work intake process is the single, documented way requests reach a team. It usually includes an intake form that captures what's needed, who needs it, the deadline, and where the context lives, so work gets prioritized before anyone starts on it.
How do you handle ad hoc requests without seeming unhelpful?
Redirect, don't refuse. Point the person to the intake form and let them know it's so the request doesn't get lost. When leaders do this consistently, the team feels comfortable doing it too.
Do you need a new project management tool to fix ad hoc requests?
Usually not. Most project management tools, including Monday.com, ClickUp, and Asana, support intake forms. The fix is one front door plus consistent behavior around it.
Which teams get the most ad hoc requests?